KELLY-THOMPSON RANCH & THOMPSON ROAD DRAINAGE ANALYSIS
Santa Cruz County, California
FCE
conducted a detailed drainage analysis for a 4.8 square mile watershed
area in southern Santa Cruz County. The primary objective of the
drainage study was to:
- Evaluate the capacity of the existing drainage channels and culverts to convey runoff from forest, range and cropland areas.
- Identify and recommend alternative measures to improve drainage and reduce erosion and flooding conditions in the area.
FCE developed a hydrologic and hydraulic model of the watershed area
employing the US Army Corp's of Engineers Hydraulic Engineering
Center's Hydrologic Modeling System (HEC-HMS) to quantify rainfall and
runoff rates in the watershed, to estimate discharge rates in the
channels and to evaluate the ability of storm water detention basins to
reduce erosion and sedimentation problems in the area.
The study was completed under the direction of a local landowner
steering committee and the Santa Cruz County Resource Conservation
District. FCE participated in several steering committee meetings to
discuss drainage issues and problems in the area and to present the
results of the study. |
|
|
NATIVIDAD CREEK STORM WATER DETENTION FACILITY
Salinas, California
Fall
Creek Engineering (FCE) in association with John Gilchrist &
Associates and Joni L. Janecki & Associates, and the California
State University at Monterey Bay's Watershed Institute, prepared
engineering design plans, specifications, site restoration plans and
construction cost estimates for a multi-function flood control project
for the City of Salinas. The project is currently under construction,
will restore 1,500 lineal feet of Natividad Creek, and create 17.5
acres of palustrine (freshwater wetlands) for flood control, riparian,
stream and wetland habitat enhancement. Historically, the project site
was a freshwater wetland that formed a portion of the Carr Lake Basin,
the predominant drainage area for the Northern Salinas Valley. The
wetland facility is contiguous with the Natividad Creek Parkway and
will include a network of trails to provide for recreational and
environmental education opportunities.
A
comprehensive hydrologic and hydraulic (H&H) study was completed by
FCE to analyze flood flows under existing and post project conditions.
The H&H was conducted to size the outlet control structure, design
the stream channel morphology and to evaluate flow conditions for adult
and juvenile anadromous fish through the facility. FCE employed state
of the art engineering design tools including three-dimensional surface
modeling and biotechnical engineering methods to develop a
comprehensive flood control and restoration project that was supported
and approved by several state and federal resource agencies, including
the California State Department of Fish and Game, California Regional
Water Quality Control Board, U.S. Fish and Wildlife Service, the
National Marine Fisheries Service, U.S. Corps of Engineers, Natural
Resource Conservation Services, as well as several local environmental
and community groups.
ARROYO MOCHO CREEK FISH PASSAGE ENHANCEMENT PROJECT
Livermore, California
Fall
Creek Engineering brought together a multidisciplinary team of
consultants, including John Gilchrist & Associates to conduct a
technical study and prepare engineering design plans to restore
anadromous fish passage in a reach of Arroyo Mocho Creek, in Livermore,
California. The project was completed for the University of California
Lawrence Livermore National Laboratory.
The
project will involve the replacement of an at-grade road that is
preventing passage of steelhead and trout in the stream and restoration
of approximately 200 linear feet of stream channel. The at-grade road
will be replaced with a clear span bridge. The channel will be restored
to a natural grade and a sequence of vortex boulder weirs will be
installed to control the grade of the channel and to enhance fish
habitat in the stream. The site will also be revegetated with native
riparian plants to restore the wetland/riparian habitat in the project
area.
The project included:
- Review of hydrologic, geologic and biotic resource information
- Hydrologic and hydraulic (H&H) analysis of to evaluate stream flow conditions
- Fish passage analysis of existing and restored channel conditions
- Evaluation of fluvial geomorphic process under existing and restored conditions
- Preparation of engineering design plans, construction specifications and cost estimates for the proposed restoration project
- Preparation
of several management plans to address erosion control, water
management, habitat restoration, pre-, during and post-monitoring and
maintenance programs
The
project was completed under the direct supervision of a Technical
Advisory Group comprised of different department staff at the lab
facility.
ALTO CORRALITOS RANCH STREAM CHANNEL AND BANK STABILIZATION PROJECT
Corralitos, California
Fall
Creek Engineering (FCE) in association with John Gilchrist and
Associates prepared engineering design plans and specifications for the
channel and bank stabilization project utilizing biotechnical methods
to restore a deeply incised stream and eroded bank along a 80 foot long
reach of Jesus Creek in Corralitos, California. The project designs
include the construction of a four-step boulder vortex weir for grade
control, a vegetated redwood log crib wall, and log revetment for bank
stabilization. Erosion control and revegetation plans were also
prepared for the project. FCE conducted a hydraulic analysis using
HEC-RAS to evaluate flood conveyance capacity and to assess shear
stress in the channel and along the banks.
ARROYO LEON STEELHEAD STREAM ENHANCEMENT PROJECT
Half Moon Bay, California
Fall
Creek Engineering (FCE) with Swanson Hydrology and Geomorphology, JGA
and HES developed engineering design plans, specifications,
construction bid documents and provided construction supervision for a
San Mateo County Resource Conservation District stream restoration
project. A steelhead fish barrier (a six-foot diameter and forty-foot
long culvert) was replaced with a boulder step-pool sequence and
biotechnical bank stabilization measures employing vegetated riprap and
log revetment for a perennial coastal stream. A clear span bridge was
installed for the access road. FCE performed hydraulic analysis using
HEC-RAS to assess flood flow capacity and channel and bank stability
under existing and post construction conditions.
COWARD CREEK BANK STABILIZATION PROJECT
Watsonville, California
FCE
prepared engineering design plans and construction cost estimates for a
biotechnical bank stabilization project on two sites on the stream. The
first project includes construction of a 60 feet long vegetated
cribwall and the second site includes reshaping the banks and
installing vegetated riprap and native plantings on the bank slope and
top bank area. The project was completed for the SCCRCD and the
landowner.
GREEN VALLEY CREEK BANK STABILIZATION PROJECT
Watsonville, California
FCE
prepared engineering design plans and construction cost estimates for a
biotechnical bank stabilization project on two sites on the stream. The
first project includes construction of a 60 feet long vegetated
cribwall and the second site includes reshaping the banks and
installing vegetated riprap and native plantings on the bank slope and
top bank area. The project was completed for the SCCRCD and the
landowner.
LOWER WEEK'S CREEK STREAM RESTORATION
Pescadero, California
Fall
Creek Engineering (FCE) has prepared a restoration plan for restoring
1,500 linear feet of Lower Week's Creek to allow for steelhead passage,
spawning and rearing habitat. The plan includes the removal of several
fish passage barriers including culverts, portions of concrete lined
channel and an in-stream pond, and restoring riparian and in stream
habitat conditions. The plan includes creating approximately 900 feet
of new stream channel, restoring sinuosity in the channel and including
overbank terraces to improve flood conveyance, and replacing several
culvert with clear span bridges or arched and bottomless culverts. The
project was completed for Mazzanti Carnations, Inc.
MUNICIPAL WATER DIVISION
San Pedro Sula, Honduras
Conducted
a technical study employing GIS to map critical ground water recharge
in the municipality of San Pedro Sula. The study recommended land use
restrictions to protect groundwater resources in the basin, as well as
presented BMPs to enhance and maintain groundwater recharge areas in
rapidly developing portions of the area.
MUNICIPAL WATER DIVISION
San Pedro Sula, Honduras
Developed
land use regulations and development standards to protect groundwater
resources in the San Pedro Sula area, which were incorporated in the
Land Use Master Plan for the County.
STONE VALLEY OAKS SUBDIVISION
Alamo, California
Prepared
a technical study to evaluate the potential hydrologic and water
quality impacts resulting from erosion, sedimentation and urban
stormwater runoff from a proposed 99 acre residential development. The
study identified and recommended BMPs to mitigate erosion and water
quality impacts resulting from the project.
UCSC HUMANITIES AND SOCIAL SCIENCES FACILITY
Santa Cruz, California
Fall
Creek Engineering (FCE) conducted a drainage analysis to evaluate the
potential environmental impacts associated with the proposed
development of a UCSC Humanities and Social Sciences facility. FCE
examined site hydrology and storm water runoff under various
development conditions, and prepared infrastructure and mitigation
recommendations based upon the results.
|